deand_327238
Jul 14, 2017Nimbostratus
Exchange IAPP F5 to F5 migration
I have an existing exchange 2010 iapp in production. Is there a method to migrate the Iapp, pools, etc. configured in that particular iapp to a seperate F5? I would like to transfer over as much information as possible instead of creating it all over again from scratch. Thanks